Greens Renovation
On Monday the 24th August we will be carrying out
our annual summer greens renovation. The whole process will hopefully be
completed in one day with all the staff taking part.
The dressing will be brushed in with the sweep and fill brush
and then the greens will be cut after. Every day after this the greens will
improve and we will keep the disturbance level down to a minimum. The greens
have received a specific granular feed already in time for these procedures so
that they will recover as quickly as possible.
This is the right time of year to be carrying out this type
of process as the warmth in the soil gives the greens the optimum amount of
recovery time.
Steve Hemsley
Head Greenkeeper
No comments:
Post a Comment